The WC129 Customer Cabling Products and Installation Working Committee is to revise the following documents:

  • AS/CA S008:2020 Requirements for customer cabling products
  • AS/CA S009:2020 Installation requirements for customer cabling (Wiring Rules)

The Working Committee is to address the following areas of review as part of the project:

For AS/CA S008:2020

  • to address the issues that have been identified in the public review of the Standard, including:
    • references to the requirements for Surge Protection Devices
    • use of legacy terminology including ‘indoor cable’, ‘outdoor cable’ and ‘underground cable’
    • requirements for lift travelling cable that us used for data
    • consideration of ‘plated copper’ and ‘copper clad aluminium’ requirements
    • use of different coaxial cable types
    • requirements for the marking and sizes of underground conduit
    • review of changes to cable flammability requirements
    • water penetration tests
    • requirements for concrete pits

For AS/CA S009:2020

  • to address the issues that have been identified in the public review of the Standard, including:
    • guidance for health & safety provisions
    • updating the broadcast cabling exemption
    • definition of cords
    • requirements for lift travelling cable that us used for data
    • review the fitness for purpose requirement
    • conductor size for generic cabling
    • heat rise in cable bundles
    • review of plug-terminated cabling requirements
    • separation distances from other services
    • EV charging systems
    • fixed and concealed cabling requirements for various cabling installations
    • cable supports and enclosures
    • depth of cover requirements

Terms of Reference

Expressions of Interest
Further information on the project can be found in the Information Pack below. Expressions of Interest to participate on the WC129 Customer Cabling Products and Installation Working Committee can be lodged using the nomination form.

Representatives
Working Committee in the process of being established.